Interventory

Our Experience

CONTRACTING ENTITY: Instituto nacional de vias-invias

OBJECT: Technical and administrative design interventory. The reconstruction the pavement and / or repavimentation of the via group 36 section 1 via bahia solano – the valley from km 0 + 000 to km 10 + 000 with a length of 10 km in the department of choco

Period to NOVIEMBRE 15 DE 2005 HASTA NOVIEMBRE 30 DE 2008

Location: Bahia Solano – Choco

CONTRACTING ENTITY: Instituto nacional de vias-invias

OBJECT: Technical and administrative design interventory. The reconstruction the pavement and / or repavimentation of the via group 36 section 1 via bahia solano – the valley from km 0 + 000 to km 10 + 000 with a length of 10 km in the department of choco

Period to NOVIEMBRE 15 DE 2005 HASTA NOVIEMBRE 30 DE 2008

Location: Bahia Solano – Choco

CONTRACTING ENTITY: Hyundai Corporation

Objetc: 115 kv transmission line between puerto lopez and puerto gai so with a length of 109 kilmeters

Period to NOVIEMBRE DE 2006 HASTA MAYO DE 2008

Location: Puerto Lopez – Puerto Gaitan

CONTRACTING ENTITY: Instituto de seguros sociales

Object: Technical interventory. Administrative and accounting on the implementation of the following works adequacy of the second floor electrical system. Disassembly and reisntalation of hydrosanitary networks. Hot water. Steam. Medicinal gases

Period to ABRIL 23 DE 1997 HASTA DICIEMBRE 29 DE 1997

Location: Clinica Carlos Lleras Restrepo

CONTRACTING ENTITY: Instituto de seguros sociales

Object: Technical interventory. Administrative and accounting on the implementation of the following works adequacy of the second floor electrical system. Disassembly and reisntalation of hydrosanitary networks. Hot water. Steam. Medicinal gases

Period to ABRIL 23 DE 1997 HASTA DICIEMBRE 29 DE 1997

Location: Clinica Carlos Lleras Restrepo

CONTRACTING ENTITY: Instituto de seguros sociales

Object: Technical interventory. Administrative and accounting for restoration works. Adequacy and finishes of the floors first. Second. Third. Quarter. Fifth. Sixth. Seventh and eighth and complementary works of the clinica carlos lleras restrepo

Period to  AGOSTO 27 DE 1997 HASTA DICIEMBRE 9 DE 1997

Location: Clinica Carlos Lleras Restrepo

CONTRACTING ENTITY: Departamento del magdalena

Object: Interventory in the execution of the works of the cienaga road – barranquilla

Period to ENERO 4 DE 1994 HASTA JUNIO 30 DE 1999

Location: Magdalena y Atlantico

CONTRACTING ENTITY: Departamento del magdalena

Object: Interventory in the execution of the works of the cienaga road – barranquilla

Period to Magdalena y Atlantico

Location: Magdalena y Atlantico

CONTRACTING ENTITY: Distrito especial industrial portuario de Barranquilla

Object: External interventory of arroyo don juan channeling work in consortium with constructions and investments zabarain de la espriella ltda.

Period to FEBRERO 1 DE 1997 HASTA NOVIEMBRE 21 DE 1997

Location: Barranquilla

CONTRACTING ENTITY: Inat

Object: Interventory of the rehabilitation of the santa marta channel and its complementary works prado district of sevilla regional 8 magdalena

Period to ENERO 22 DE 1996 HASTA FEBRERO 21 DE 1997

Location: Departamento Tolima